Skip to main content

Table 3 Normalised feedstock cost estimates

From: The commercial performance of cellulosic ethanol supply-chains in Europe

Feedstock (delivered to the plant as chips/bales)

Cost (2005US$ odt-1)

 

Low

Mid

High

Softwooda

51.5

74.5

107.7

Straw

66.1

100.9

153.9

  1. aMid-point is equal to geometric mean of pulplog and forest residue costs only. The geometric mean was chosen because plotting a histogram of estimates indicated a log normal distribution.