Table 2 Installed equipment cost (in million $) for the individual areas of the biorefinery and total capital investment as a function of biorefinery feedstock capacity

From: Techno-economic analysis of an integrated biorefinery to convert poplar into jet fuel, xylitol, and formic acid

Biorefinery feedstock capacity (dry ktonne/year)

Fixed capital (million $)

150

(Small-scale)

250

(Intermediate-scale)

760

(Large-scale)

Biomass fractionation (A100)

33

39

59

Saccharification (A200)

16

25

65

Fermentation (A300)

20

22

30

Alcohol dehydration (A400)

3

5

10

Oligomerization (A500)

4

6

14

Hydrogenation (A600)

10

13

23

Xylitol production (A700)

23

32

65

Formic acid production (A800)

18

28

74

Boiler/turbogenerator (A900)

63

86

168

Wastewater treatment (A1000)

35

47

94

Total installed equipment cost

225

303

602

Total capital investment

418

559

1109