Fig. 5

Current generation (a) and 3-HP production (b) with the respiratory inhibitors during BES operation. All BES reactors were operated under the condition of spontaneous electron discharge to the anode with a fixed resistance (1 kΩ). Control contained the same amount of ethanol and DI water instead of inhibitors