Skip to main content

Table 6 Installation factor and characteristic exponents used in Eqs. 2 and 3 to calculate the installed and scaled costs of the individual unit operations

From: Techno-economic analysis of an integrated biorefinery to convert poplar into jet fuel, xylitol, and formic acid

Equipment

Installation factors

Exponent

Mixer

1.00

0.50

Tank (flash, chemical addition, crystallizer)

2.00

0.70

Main fermenter

1.50

1.00

Seed fermenter

1.80–2.00

0.70

Heater

2.20

0.70

Boiler

1.80

0.60

Turbine

1.80

0.60

Washer

1.00

1.00

Filter press

2.30

0.80

Decanter

2.00

0.70

Multiple-effect evaporator

2.20

0.60

Spray dryer

1.00

0.70

Membrane

1.80

0.70

Centrifuge

1.00

0.60

Activated carbon filter

1.80

0.70

Hydrotreating facility

2.00

0.50

Column

 Beer

2.40

0.80

 Hydrocarbon separation column

2.47

0.68

 Condenser package

2.47

0.44

 Reboiler package

2.47

0.68

Reactor

 Pretreatment

1.50

0.60

 Electrocatalytic

1.00

1.00

 Dehydration and oligomerization

2.47

0.65

Pump

 Water

3.10

0.80

 Saccharification transfer

2.30

0.80

 Crude hydrocarbons

2.47

0.79